Timeline for Enlightened Transition

How the next 50 years develop under the Enlightened Transition Scenario.

2005-2015

  • Steps towards a planned transition to indigenous energy sources are taken immediately.
  • Flood of wind farm projects connected to grid.

.

2015-2035

  • Ireland becomes world leader in developing tidal stream and electricity storage technologies.
  • Massive windfarms off the west coast enable Ireland to become a major exporter of electricity to Britain.
  • Two cement factories close as the level of new building falls and the construction sector switches to techniques involving materials with less embodied energy.
  • The timber frame sector expands as does other low embodied energy construction systems such as hemp / lime construction. Retrofitting for energy efficiency becomes a booming industry covering all building trades.

2035-2055

  • Irish energy prices drop below the European average. Energy-intensive manufacturing processes move back.


Retrieved from "http://info.energyscenariosireland.com/Enlightened_Timeline"

This page has been accessed 576 times. This page was last modified 18:46, 13 May 2005.

 





Table of Contents

Overview

Introduction
Peak Oil
Scenario Planning
More About the Project

Analysis

The ECCO Model
Results from ECCO Model

The Scenarios

Business As Usual 1PageDetail
Enlightened Transition 1PageDetail
Localisation 1PageDetail
Fair Shares 1PageDetail

Background and Support

Workshop Material
Glossary
References
FAQ
Credits
Find
Browse
Main Page
Recent changes
Random page
Help
This page
Post a comment
Printable version
Context
Page history
What links here
Related changes
My pages
Create an account or log in
Special pages
Special pages
New pages
All pages
Image list
Statistics
Bug reports
More...